Skip to main content
Krabi RenovationsSteelwork · Home Extensions

Guide

Labour-Only vs Full Contract for Home Projects in Thailand

Written by Rong, lead craftsman at Krabi Renovations ·

Black steel box sections, metal roof sheets and cement bags on a concrete slab under a new steel roof frame beside a white single-storey house

When you ask Thai contractors for quotes, you will often be offered two options: ruam wat-sadu (a full contract, including materials) or kha raeng (labour-only, where you provide the materials). Foreign homeowners are sometimes surprised by the second option, but it is common here.

Both can work well. The right choice depends on how much time you have, how confident you are buying building materials, and how much risk you are willing to carry. We offer both, and this article explains the trade-offs honestly.

What each option means

Full contract

The contractor supplies materials and labour. You agree a scope and a price; the contractor orders the right steel, sheets, fixings and coatings, gets them delivered, and builds.

Labour-only

You buy and deliver the materials; the contractor provides the team, tools and know-how to build. The contractor usually gives you a materials list, but buying, checking and getting items to site is your job.

Mixed

Somewhere in between: you supply some items, often the visible finishes such as roof sheets or deck boards, and the contractor supplies the rest.

Who buys what

Full contractLabour-only
Steel sectionsContractorOwner
Roof sheets, deck boardsContractorOwner
Fixings, sealants, flashingContractorOwner (often forgotten)
Primer and paintContractorOwner
Delivery to siteContractorOwner
Checking sizes and qualityContractorOwner, with contractor checking on arrival
Waste removalAs agreedAs agreed

The small items in that list are where labour-only jobs most often stall. A missing box of roof screws can stop work.

Where the savings are real

Labour-only genuinely saves money when:

  • You already have materials, perhaps left over from another project or salvaged in good condition
  • You have a trade account or a supplier who gives you good prices
  • You want a specific product and would rather buy it yourself
  • The job is simple, with a short materials list and little room for error
  • You live near a builders' merchant in Krabi Town and can collect easily

It also gives you direct control over what goes into the job, which some owners value.

Where the savings disappear

Wrong sizes or specifications

Steel comes in many section sizes and wall thicknesses. Roof sheets come in different profiles and thicknesses. A section that looks similar but is thinner can make a structure weaker. A sheet with the wrong profile will not match flashing or ridge pieces.

Delivery delays

If materials arrive late, the team may have to leave and come back, and a slot in the schedule is lost. On sites with difficult access, or for Ko Lanta and other boat-access areas, a missed delivery is especially costly.

Material quality

Not all steel or coatings are equal. Cheaper products can look the same on the shelf and fail sooner, particularly near the sea. Read our article on stopping rust on steel near the sea before choosing coatings.

Quantities

Buying too little stops work; buying too much wastes money. Off-cuts, overlaps and allowances for mistakes are easy to overlook.

Your time

Sourcing, comparing, ordering, chasing delivery and receiving materials all take time. For someone who does not read Thai, it can take a lot more.

Risks checklist for labour-only

Before choosing labour-only, be sure you can answer yes to most of these:

  1. I have a full written materials list from the contractor, including small items
  2. I understand the specifications (sizes, thicknesses, profiles, coatings)
  3. I have a supplier who can deliver to site on a set date
  4. Someone will be on site to receive and check the delivery
  5. I have somewhere dry and secure to store materials
  6. I accept responsibility if materials are wrong or late
  7. I have a Thai speaker to help with suppliers, if needed

If several answers are no, a full contract is probably less stress.

How we handle both

Full contract with us

  • Free site survey by Rong
  • Written itemised quote, with steel grade and rust protection that you choose
  • We order and deliver materials
  • 30% deposit to buy materials, balance as written in the quote
  • Cash bill, not a VAT invoice
  • One-year warranty under the site conditions written in the quote

Labour-only with us

  • Free site survey and a written quote for labour
  • A materials list for you to buy against
  • We check materials when they arrive and tell you if something looks wrong before we use it
  • The warranty covers our workmanship; material defects are between you and your supplier

See our labour-only price guide for how we price it, and the general pricing page for what drives cost.

Which projects suit which option

Often fine as labour-only

  • Simple lean-to roofs and small awnings
  • Re-roofing with sheets you have already chosen
  • Small storage rooms with a straightforward frame

Usually better as a full contract

  • Large roofs or complex roof shapes
  • Cantilever structures and anything with engineering input
  • Coastal projects where coating systems matter
  • Island or remote sites where a missing part is expensive

If you are comparing quotes from several contractors, our guide on hiring a builder in Krabi as a foreigner explains how to line them up fairly.

Next step

Not sure which suits your project? Send photos and a short description through LINE on our contact page, and tell us whether you already have any materials. We can quote both ways so you can compare.

Frequently asked questions

Is labour-only always cheaper?

The labour line is smaller, but the total is not always lower. You pay for materials yourself, plus transport, and any wrong or missing items can add cost and delay. Savings are most real when you already have materials or can buy them well.

Can I supply only some of the materials?

Often yes, for example you buy the roof sheets and we supply the steel and fixings. Mixed arrangements need a very clear written list of who supplies what.

Who is responsible if my materials are wrong?

Under labour-only, the owner is responsible for the materials they buy. We check what arrives before using it and tell you if something looks wrong, but delays or extra costs from wrong materials are not covered by our work.

Does the warranty differ between the two?

Our one-year warranty covers our workmanship under the site conditions written in the quote. On labour-only jobs, material defects are a matter between you and your supplier. The quote spells out exactly what is covered.

Services related to this guide

Not sure what will work at your place? Send us photos first

A wide shot of the space, the wall or beam it would attach to, and the ground where posts would go. Add a location pin on LINE and Rong will tell you what is realistic before booking a free site visit.